The next CCS example in SE Asia to be discussed is the BP Tangguh project in Indonesia. A giant depleted gas reservoir is planned for carbon sequestration along with Enhanced Gas Recovery (EGR). Significant CO2 emissions from the LNG facilities will be captured and injected into the nearby Vorwata reservoir.
CO2 Transport
2 posts
There are currently over 50# CO2 pipelines that cover a distance of ~5,000 miles (8000 km). The lack of CO2 transport infrastructure is definitely a limiting factor for CCS scale-up. Existing oil and gas pipelines can be converted to CO2 transport pipelines for short-distance, low-volume transport. For these distances, CO2 may be transported in […]